INSTALLATION GUIDE
Magnesium Oxide Board Installation Instructions
General handling, cutting, fastening and finishing guidance for Sulfycor magnesium oxysulfate boards used in wall, subfloor, panel and project-built assemblies.
INSTALLATION GUIDE
General handling, cutting, fastening and finishing guidance for Sulfycor magnesium oxysulfate boards used in wall, subfloor, panel and project-built assemblies.
DOWNLOADABLE TECHNICAL GUIDE
Seven-page PDF covering board selection, storage, cutting, fastening, joints, application boundaries and final inspection.
01 · BEFORE INSTALLATION
The generic term “MgO board” does not define an installation system. Surface finish, board thickness and end use change how the board is supported, fastened, jointed and finished.
| Board family | Typical role | Confirm before installation |
|---|---|---|
| Non-Woven Finish MgO Board | Wall sheathing, SIP facing, modular-wall structure and selected ductwork assemblies | Frame layout, thickness, edge support, fastener schedule, membrane/cladding and required wall or duct performance |
| Sanded Magnesium Oxide Board | Subfloor, underlayment and specified structural floor systems | Joist or substrate layout, loading, span, thickness, edge support, floor finish and moisture management |
| Decorative MgO Wall Board | Melamine- or HPL-faced interior and modular-house walls | Panel dimensions, fixing method, trims, joints, exposed edges and cleaning/maintenance requirements |
A board test result does not automatically qualify every thickness, finish or completed assembly. Match required performance to the tested sample or approved construction detail.
02 · STORAGE AND HANDLING
Do not dry sweep cutting or sanding dust. Follow the project safety plan, tool instructions and applicable safety data sheet.
03 · CUTTING AND LAYOUT
04 · FASTENING
Use fasteners compatible with magnesium oxysulfate board, the supporting material and the exposure environment. Wood and light-gauge steel require different thread and point designs.
| Check | General guidance | Confirm for the project |
|---|---|---|
| Fastener material | Match the board, frame and exposure. | Coating/stainless grade and corrosion category |
| Fastener layout | Use an orderly sequence that keeps the board flat and stress-free. | Field/perimeter spacing and edge/corner distance |
| Fastener depth | Set the head flush and secure; do not overdrive or crush the face. | Whether countersinking is permitted |
| Board support | Keep joints and board ends supported where the assembly requires. | Framing centers, blocking and joint orientation |
05 · GAPS, JOINTS AND FINISHING
06 · APPLICATION NOTES
| Application | Installation priorities | Review application |
|---|---|---|
| Wall sheathing | Frame, thickness, fasteners, supported edges, membranes, flashings, cladding and wall performance. | Wall sheathing → |
| Subfloor or underlayment | Joist/substrate, loading, span, thickness, support, flatness, moisture control and finished flooring. | Subfloor systems → |
| SIP and modular walls | Approved factory drawings for facings, core, adhesive, pressing, joints, connections and openings. | SIP panels → Modular walls → |
| Decorative wall board | Protect the Melamine/HPL face; confirm fixing, trims, joints, exposed edges and visual approval. | Interior decoration → |
| Fire-rated ductwork | Use only the specified tested or engineered duct assembly; board classification alone is not duct-system fire resistance. | Ductwork → |
07 · FINAL INSPECTION
Cracked edge: fastener position, overdriving, impact or unsupported board edge.
Visible joint: substrate flatness, joint system, curing and finish compatibility.
Recurring joint crack: frame movement, gap detail, control joint or rigid filler.
Fastener staining: fastener material/coating, moisture path and exposure.
Board distortion: storage support, moisture exposure, forced fixing or uneven framing.
INSTALLATION FAQ
Review cutting, fastening, joints and handling before preparing the selected board for installation.
Score-and-snap may suit selected boards and thicknesses. Thicker or precision cuts normally require a carbide-blade saw with dust control. Confirm the selected product before cutting.
Use fasteners compatible with the magnesium oxysulfate board, frame and exposure. Confirm thread, point, head, length, coating and spacing for the project.
There is no single universal gap. Board-to-board, perimeter and movement gaps depend on the application, thickness, framing, finish and approved assembly detail.
Boards should reach the installation conditions specified for the project. Keep them dry and protected, and do not install visibly wet, damaged or distorted boards.
No. Wall sheathing, subflooring, SIP facings, decorative panels and ductwork are different assemblies with different support, joint and performance requirements.
No. A board classification applies to the tested sample. A wall, floor, SIP or duct must follow its specified tested or engineered assembly.
Start Your Enquiry
Send the application, board specification, framing and joint details.